![]() |
|
|---|---|
|
Other Services |
|||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Soil Evaluation Soil evaluation is one of the requirements of designing a new sewage disposal system. Test holes are dug in the location of the leaching facility and a percolation test is performed. The results of the soil evaluation are submitted to the property owner and the town Health Department. A soil evaluation is required for any new construction or sewage disposal system upgrade or expansion. |
||||||||||||||||||||||||||||
Sewage Disposal System Inspections Title 5 may require that a septic system be inspected any of the following reasons:
An inspection must be performed by a State approved inspector and is valid for
2 years. A report must be completed and filed with the local Health Department.
In addition, many Health Departments have their own forms to complete as well as fees for reviewing the reports. |
||||||||||||||||||||||||||||
|